Plumbing Rough Checklist

WALK THROUGH WITH PLUMBER - LAYOUT AND MARK EACH ITEM IN THE HOUSE

JOBSITE COND:

  • Rough Clean

  • Cabinets Painted out

BUILDER MATERIAL CHECKLIST

  • Rough in valves - distribute to actual locations day before rough-in

  • Freestanding tub rough, ideally tub will be onsite (sometimes the tub sells out later)

  • Wall mount lav roughs? Y/N

  • Tubs

  • Tub protectors

GENERAL

  • Check spec sheet for special requests and general specs

  • Water softener/whole home filter: Y/N Location:

  • RO Water: Y/N Location: - if yes, updated elec checklist to have ded. outlet

  • Toilet supplies: standard height is centered on base, copper stub

  • WH Type: Standard: Navian Tankless Location:    , provide venting

  • Hose bibbs: Number: __    Locations: __________ Aquor? Y/N  Standard: woodford 17

  • Shower elbows: 7’0H

  • Control Heights: valves 48in, hand wand 45, center body spray around 45in

  • No notching trusses, for drilling LVL see allowable holes diagram by manufacturer

  • Washer machine location

  • 3in Future Radon pipe from basement to attic (cap)

  • Cast Iron Anywhere (for sound): Y/N

KITCHEN & BARS SPECIFIC

  • Stand alone Ice maker? Y/N - if Yes, provide drain location

  • Column fridge Y/N - if Yes, provide accessible cutoff

  • Pot Filler Y/N

  • Dishwasher count: ___

BATHS/SECONDARY AREAS

  • Wall mount lavs? Y/N - height, and depth (account for finish thickness)

  • Toilet location: 15in clear to vanity/tub/wall min. each side. Center when possible.

Previous
Previous

Control4

Next
Next

Custom Home Building Process